Application Method
Brush or Roller
Coverage per Litre
Up to 16 m²
Drying Time
Dependent on temperature/humidity
Drying time between coats
4 - 6 hrs
Clean equipment with
After use, remove as much paint as possible from equipment before cleaning with water
Suitable for
Interior Wall & Ceiling surfaces disfigured by mould
Manufacturer Model No
5091630